Landing Paving Stone at Kralendijk and Getting It to Site

Freight reaches Bonaire without a transfer at another island, and that single fact reshapes how a paving order is planned. Booking pavers routed through the Kralendijk piers settles half the job, while the road leg and the unloading point settle the other half. Decide where the crates will land before the container is booked.

Table of Contents

A direct sailing, not a relay

Bonaire takes ocean freight that leaves the United States and reaches Kralendijk without being lifted onto a second vessel on the way. King Ocean Services has run a weekly ABC service since 1982, sailing from Port Everglades in Florida on Saturday and calling at Oranjestad on Tuesday, Willemstad on Wednesday and Kralendijk on Thursday. That makes the Bonaire leg a five-day transit, and the carrier describes the service as direct and non-transshipped. Cut stone is heavy and brittle at the edges, so every handling cycle removed from the route is one fewer chance to chip an arris or split a crate. It also makes the schedule legible: one departure day, one arrival day, and a booking you can plan a laying week around.

What the Kralendijk piers publish

Published port information lets you sanity-check a booking before you commit to it. Confirm the detail with your forwarder for the sailing you are actually on, since berth allocation moves with cruise and cargo traffic.

  • North Pier: 69 m (225 ft) long, 15 m (50 ft) wide, 10 m (33 ft) alongside depth, rated to 50,000 DWT.
  • South Pier: 120 m (394 ft) long, 14 m (46 ft) wide, 12 m (40 ft) depth, rated to 115,000 GRT, fitted with a Ro-Ro ramp.
  • A separate Ro-Ro and ferry jetty handles vessels to 100 m length overall, 5.5 m draft and 5,000 GRT.
  • Port maximums are 115,000 DWT, 12.19 m draft and 320 m length overall, with three vessels alongside at once.
  • The port works around the clock, with container handling equipment and warehousing on site.

Paper closes before the ship sails

Documentation cut-offs on the ABC service fall between Wednesday and Friday depending on cargo type, so the commercial invoice, packing list and origin paperwork have to be settled before the Saturday departure rather than chased after it. On arrival, an import declaration is filed with Douane Caribisch Nederland. Ask your forwarder which cut-off applies to your cargo type rather than assuming the latest one, and check that the description on the invoice matches the packing list line for line, because a mismatch is the sort of thing that surfaces at the worst possible moment. Work the sequence backward from the sailing date instead of forward from the purchase order, and paperwork stops being the reason a container sits while a laying crew stands idle.

Packing stone for a single lift

Stone travels best when it is packed for the handling it will actually get rather than for an ideal warehouse. We crate cut paving units for Bonaire sites so one forklift cycle moves a full format from the container floor to the stack.

  • Ask for crate weights before booking, not after the container has been sealed.
  • Keep one format to one crate so the crew is not sorting units on open ground.
  • Check that crate footprints suit the forklift on site, not only the one at the port.
  • Have edge protection written into the order for sawn arrises and finished faces.

The road leg you actually control

The last stretch is the part of the journey a buyer genuinely controls, and it repays a walk-through before delivery day rather than a discovery from the cab of a truck.

  • Measure the gate opening and the space a rigid truck needs to turn and leave again.
  • Confirm any posted weight limit on the approach with the trucking company in advance.
  • Find firm, level ground for the forklift, because loose surfaces turn a short unload into a long one.
  • Decide whether a truck-mounted crane is needed and book it with the delivery, not on the day.
  • Agree who signs for damage, and photograph crates before they leave the pier.

Unloading beside a protected shoreline

Bonaire National Marine Park covers all the water around Bonaire and Klein Bonaire, from the high-water mark down to 60 m, and STINAPA Bonaire manages it. A shoreline delivery is staged at the park boundary, not merely near it. Silt is the concern as much as spillage, so keep cutting and washdown water away from the shore, bund any wash bay, and stack crates where dust and slurry cannot run seaward. Agree the wash point with the contractor before the first crate is opened. In the coastal zone, works affecting natural vegetation can need permission from the bestuurscollege, so settle access routes with your permit team rather than improvising a track.

Storage between arrival and laying

Stone often lands before the base is ready. Treat that gap as part of the plan instead of an unwelcome surprise.

  • Store crates off the ground on timber bearers and clear of standing water.
  • Keep covers loose enough to vent, since sealed plastic in strong sun traps moisture against the stone.
  • Site the stack where salt-laden wind will not scour open faces day after day.
  • Open one crate for approval and leave the rest banded until the crew is ready.

Sequencing the order against the plan

The strongest order is written against the laying plan rather than the wish list: terrace formats first, driveway units in the same booking, edge restraint and any specials riding along instead of waiting a week for the next sailing. You can read our supply arrangements into Bonaire before you brief a forwarder, then match the crate schedule to the sequence your installer will actually work in. Book the stone and the road leg as one decision, never as two.

Free Technical Consultation

Speak directly with our stone specialists about your project

Project Supply Pricing

Competitive rates for trade and commercial orders

You can book a free consultation at any time, with no fee commitments required.

Alternative Products Available

Product NameDescriptionPrice per Square Foot
TravertineBeautiful natural stone with unique textures$8.00 - $12.00
MarbleLuxurious and elegant, available in various colors.$10.00 - $15.00
GraniteExtremely durable and perfect for high-traffic areas.$7.00 - $12.00
SlateRich colors and textures; ideal for wet areas.$6.00 - $10.00
PorcelainVersatile and low-maintenance, mimicking natural stone.$4.00 - $8.00
CeramicAffordable with a wide variety of designs.$3.00 - $6.00
QuartziteStrong and beautiful, resistant to stains.$9.00 - $14.00
ConcreteCustomizable for patios; durable and cost-effective.$5.00 - $9.00
GlassStylish, reflective, and brightening.$15.00 - $25.00
CompositeEco-friendly options made from recycled materials.$5.00 - $10.00

Frequently Asked Questions

If your question is not listed, please email us at kareem@citadelstone.us

How long does stone take to reach Bonaire from the United States?

King Ocean Services publishes a weekly ABC service that leaves Port Everglades on Saturday and calls at Kralendijk on Thursday, a five-day transit described as direct and non-transshipped. Add your own time for crating, inland haulage to the port and documentation cut-offs, which fall between Wednesday and Friday depending on cargo type. Build the schedule backward from the sailing you intend to catch.

Not on that service. The carrier runs the ABC rotation as a direct call, so a container booked for Kralendijk stays on the same vessel from Florida. That matters for cut stone, because each extra lift is an extra chance of damage to arrises and crates. Ask your forwarder to confirm in writing that the booking is a direct call, not a relay.

Port listings give North Pier at 69 m long with 10 m depth alongside and a 50,000 DWT rating, and South Pier at 120 m long with 12 m depth, a Ro-Ro ramp and a 115,000 GRT rating. Overall port maximums are quoted as 115,000 DWT, 12.19 m draft and 320 m length, with three vessels alongside and around-the-clock working. For a container of paving, that is comfortable rather than marginal. Confirm the working arrangements for your own sailing with your agent.

Pack for the weakest handling point on the whole route, which is often the site rather than the port. Keep one format to one crate, ask for crate weights before booking, specify edge protection for sawn faces, and check that crate footprints suit the forklift that will be waiting at the property. Good packing costs a little and saves broken units.

Walk it first. Measure the gate opening and the turning space a rigid truck needs, confirm any posted weight limit with the trucking company, and identify firm level ground for the forklift. Decide in advance whether a truck-mounted crane is required and book it with the load. Agree who signs for damage, and photograph crates before they leave the pier.

Yes. We hand-pick premium natural stone at our selected quarries, crate it for a single handling cycle, and set out the schedule so crate contents match the order your installer will lay in. Tell us the site access, the forklift available and the target laying week, and we will shape the booking and the crate list around them.