Sett Cost, Labor and Phasing a Build in SVG

The cost of a sett surface here is three numbers, not one: the stone, the landing and the labor. Planning sett quantities for staged builds around the shipping calendar is usually where the savings are found. Price the phase you are actually building, not the whole scheme at once.

Table of Contents

Three Numbers, Not One

Most people asking what setts cost in Saint Vincent and the Grenadines are really asking about three separate numbers that behave differently: the stone itself, the landed cost of getting it here, and the labor to lay it. Treat them as one lump and the budget will be wrong in both directions. Treat them separately and you can usually find the savings without changing the material at all, which is the outcome most clients actually wanted in the first place. The order in which you fix those three numbers matters too, because the stone is the only one of them you can change late without disrupting everything else.

What Lands on the Invoice Before the Stone Does

Imported paving collects several charges between the ship and the site, and they are easy to underestimate at the drawing stage. None of them is dramatic on its own, but together they move a budget noticeably.

  • Ocean freight to Kingstown, which takes cargo directly rather than through another hub.
  • Duty under the CARICOM Common External Tariff, entered by an authorized agent.
  • A Customs Service Charge on top of duty and VAT, including on duty-free lines.
  • Handling, plus the inter-island vessel leg if the site sits in the Grenadines.

Duty and VAT as They Stand Now

VAT is currently 16 percent, as published by the Inland Revenue Department, though the rate is under government review, so confirm it at the time of quotation rather than relying on an older published figure. Duty on natural stone paving depends on the tariff line and should be checked against the General Import Duty Calculator published by SVG Customs rather than taken from a supplier. Commercial entries are filed through an authorized agent in ASYCUDA, and the Customs Brokers Directory is a sensible starting point if you do not already work with one. Building these lines into the first budget, rather than discovering them at the port, is the difference between a plan and a surprise.

Labor Is the Bigger Half

Setts are a slow surface to lay. That is the point of them, and it is also the honest cost. A skilled mason laying small units to a curve covers a fraction of the ground a slab crew covers in the same day, and the difference is not incompetence, it is the pattern. Anyone comparing a sett quotation against a large-format one is comparing two different amounts of craft, and the sett surface is the one that can be repaired unit by unit for decades afterward. The pallet counts and sett coverage we publish are meant to go straight to whoever prices the labor, because coverage per pallet drives their number as much as it drives ours.

Phasing a Build Across Seasons

Villa projects here rarely run in one clean sequence, and the calendar has opinions of its own. Phasing well protects the budget and the finish together, and it also protects the tone, which is the thing clients notice immediately when it goes wrong.

  • Bring the whole order in at once so tone and sorting stay consistent throughout.
  • Bonded warehousing runs to two years, which suits a staged villa build.
  • Lay drives and service areas first, then the terrace once wet trades have finished.
  • Keep finished paving out of the construction traffic route entirely.

The Inter-Island Leg Costs You in Packing

If the site is on Bequia, Mustique, Canouan, Mayreau or Union Island, the final leg is a small vessel rather than a truck. Services such as the Bequia Express, the MV Gem Star and the MV Barracouda carry pallets and loose freight, and Admiralty Bay at Port Elizabeth has limited cargo handling facilities. Pallet weight and footprint become the binding constraint, so it is often cheaper to break a container down at Kingstown into smaller consignments than to fight the last leg with oversized crates. A load that has to be repacked on the quay costs time nobody put in the schedule.

Where Money Usually Gets Wasted

Overruns on sett projects are remarkably predictable, which means most of them are avoidable with an afternoon of planning.

  • Ordering short and paying twice for a second, much smaller shipment.
  • Choosing a radial pattern after quantities were priced on a straight bond.
  • Skipping the base and rebuilding the surface after the first heavy rain.
  • Leaving edge restraint out of the first phase and retrofitting it later.

Getting a Number You Can Build To

A useful quotation names the format, the depth, the finish, the pallet configuration and the delivery point, because on these islands the delivery point moves the price further than the stone specification ever does. Send us the drawing, the island, the access notes and the phase dates, and put a phase out to quote rather than the whole build if the schedule is still moving. Duty and tax should be confirmed with your broker at the time of order.

  • The island and the landing point, not simply the country on the address.
  • The pattern, since it changes quantities before it changes anything else.
  • The phase dates, so storage and shipping can be planned around them.
  • The name of your broker or agent, who confirms duty and tax at entry.

A budget that names the island is a budget you can actually build to.

Free Technical Consultation

Speak directly with our stone specialists about your project

Project Supply Pricing

Competitive rates for trade and commercial orders

You can book a free consultation at any time, with no fee commitments required.

Alternative Products Available

Product NameDescriptionPrice per Square Foot
TravertineBeautiful natural stone with unique textures$8.00 - $12.00
MarbleLuxurious and elegant, available in various colors.$10.00 - $15.00
GraniteExtremely durable and perfect for high-traffic areas.$7.00 - $12.00
SlateRich colors and textures; ideal for wet areas.$6.00 - $10.00
PorcelainVersatile and low-maintenance, mimicking natural stone.$4.00 - $8.00
CeramicAffordable with a wide variety of designs.$3.00 - $6.00
QuartziteStrong and beautiful, resistant to stains.$9.00 - $14.00
ConcreteCustomizable for patios; durable and cost-effective.$5.00 - $9.00
GlassStylish, reflective, and brightening.$15.00 - $25.00
CompositeEco-friendly options made from recycled materials.$5.00 - $10.00

Frequently Asked Questions

If your question is not listed, please email us at kareem@citadelstone.us

What drives the cost of setts in SVG the most?

Usually the labor and the delivery point rather than the stone. Small units take time to lay, especially to a curve, and the last leg to a Grenadine island changes handling costs considerably. Format, depth and finish move the material line, but two identical orders going to Kingstown and to Union Island will not land at the same figure.

The standard rate published by the Inland Revenue Department is 16 percent, and it applies alongside duty and a Customs Service Charge. The rate has been under active government review, so it should be confirmed at the time of quotation rather than assumed from an older document. Your broker or authorized agent will give you the position that applies on the day of entry.

Yes, and there are two ways to do it. Bring the full quantity in at once and store it, which keeps tone and sorting consistent, or ship in phases and accept some variation between batches. Bonded warehousing in Saint Vincent and the Grenadines runs to two years, which suits most villa schedules. Discuss storage and handling with your agent before deciding.

Enough to cover closures, breakages and future repairs, with the allowance set against the actual pattern rather than a general rule. Radial and circular layouts consume noticeably more than straight bonds. Ordering the reserve with the main consignment is almost always cheaper than shipping a small top-up later, particularly when the site sits beyond Kingstown on a vessel leg.

On these islands, yes. Pallet weight and footprint decide how easily a load moves from Kingstown to a Grenadine landing where handling equipment is limited. Loads built for a forklift and a warehouse door often have to be broken down and repacked, which costs time and money. Agreeing pallet sizes at quotation is one of the cheapest savings available.

We supply premium natural stone hand-picked at partner quarries, and we quote against the island, the phase and the access rather than a generic delivered rate. Send the drawing, the pattern and the dates, and we will confirm formats, coverage, pallet weights and lead times. Small samples go out first, and local duty and tax are confirmed with your broker at order.