Seasonal Guide: When to Schedule Your Paver Installation in the Bahamas

Introduction — Why Timing Matters on Island Paver Projects

Paver installation Bahamas projects require precise seasonal timing to avoid costly delays, quality issues, and storm-related risks. Unlike mainland construction, Bahamian paving must navigate hurricane season shipping restrictions, elevated humidity affecting material curing, intense seasonal rainfall that disrupts base preparation, and limited container vessel schedules that affect material delivery windows. Poor timing decisions cost money and compromise installation quality. Projects scheduled during hurricane season face material staging risks, shipping delays, and potential storm damage. Installations attempted during peak wet season often suffer from inadequate base compaction and joint setting problems that create long-term maintenance issues.

Need a Free Quote?

Hassle-Free Pricing

Hurry! Limited Time

Grab 10% Off Before the Offer Ends

Choose Value—Start Your Better Investment!

100% Satisfaction

Trust 50 Years of Expertise. Invest in Quality Limestone Tiles

Experience True Flexibility—Customize Your Order with Ease!

You can book a free consultation at any time, with no fee commitments required.

Recommended by Top Stone Experts Around the Globe

Trusted by Top Stone Experts Around the Globe

One Supplier, Endless Possibilities for Limestone Tiles!

Unlock the potential of your spaces with our expansive range of limestone tiles, ideal for both residential and commercial applications. As a premier limestone tile supplier, we provide a diverse selection of colors, textures, and finishes to suit any design vision. Transform your environment with our high-quality limestone tiles, where each piece offers durability and aesthetic appeal tailored to your specific needs.

Incredible Prices for Top-Quality Stone—Shop Citadel Stone Today!

Instant Quote & Immense Value

Table of Contents

This seasonal guide provides the practical framework Bahamian property owners, contractors, and project managers need to schedule installations for optimal results while minimizing weather and logistical risks.

Bahamas Climate & Construction Windows — Quick Overview

Key Local Seasons and Construction Implications

The Bahamas paving season follows distinct climatic patterns that directly impact construction scheduling. The dry season (December through April) provides optimal conditions for base preparation, material staging, and installation work with minimal rainfall interruption and lower humidity levels.

Wet season (May through November) coincides with hurricane season, creating compound challenges. Heavy rainfall from tropical systems saturates subgrades, making proper compaction difficult or impossible. High humidity extends curing times for mortars and sealers while promoting biological growth on staged materials.

Hurricane season officially runs June 1 through November 30, though storm activity typically peaks August through October. Even near-miss storms disrupt shipping schedules and create hazardous working conditions that halt construction for days or weeks.

Shop pavers Bahamas now to bring a natural, textured look to your landscape.

Temperature, Rainfall and Ground Moisture Patterns

Bahamian temperatures remain relatively stable year-round, ranging from 70-85°F, making temperature-sensitive installation activities manageable throughout most months. However, temperature alone doesn’t determine optimal installation windows.

Rainfall patterns show dramatic seasonal variation. Dry season months average 1-3 inches monthly, while wet season can deliver 6-12+ inches with individual storms producing several inches in hours. This moisture dramatically affects subgrade conditions and base preparation quality.

Ground moisture retention in coral-based Bahamian soils means saturated conditions persist 1-2 weeks after heavy rainfall events. Attempting compaction on saturated subgrades results in poor density achievement and long-term settlement problems.

Best Months to Install Pavers — Month-by-Month Recommendations

Seasonal Calendar for Bahamas Paver Projects

MonthRecommended?Primary ActivitiesRisks to Avoid
JanYesInstall, base prep, sealingMinimal – optimal conditions
FebYesInstall, base prep, sealingMinimal – peak season
MarYesInstall, base prep, deliveryMinimal – excellent conditions
AprYesInstall, base prep, deliverySpring break crowds
MayConditionalFinal deliveries, install startEarly season storms possible
JunNoMaterial staging onlyHurricane season begins
JulNoCovered storage maintenancePeak storm season
AugNoStorm preparationHighest storm risk
SepNoStorm preparationPeak hurricane activity
OctNoDamage assessmentLate season storms
NovConditionalPlanning, minor repairsSeason transition
DecYesDeliveries, site prep, installExcellent conditions return

Prime Installation Windows Summary

Peak installation season runs December through April, offering the best time to install pavers Bahamas conditions. January through March represents the optimal window with minimal rainfall, stable temperatures, and reliable shipping schedules.

December and April serve as shoulder months with generally favorable conditions but slightly higher weather variability. These months work well for project preparation and delivery scheduling while avoiding hurricane season risks entirely.

May and November require careful evaluation. Early May can work for urgent projects if materials are already staged, while late November allows season preparation as conditions improve.

Pre-Project Timeline — When to Start Planning

Procurement Lead Times for Stone

Paver lead times Bahamas vary significantly by material source and complexity. Local Bahamian limestone typically ships within 1-4 weeks (illustrative) for standard products, though specialty finishes may require 6-8 weeks.

Imported materials require 8-14+ weeks (illustrative) including production, container loading, ocean transit, and customs clearance. Popular mainland stones like Indiana limestone or Georgia granite need advance planning to ensure dry-season delivery.

Specialty products including custom cutting, edge profiles, or unique finishes can extend lead times to 16-20 weeks. Plan these items earliest in the procurement timeline to avoid schedule delays.

Natural Stone Tiles Bahamas require only occasional sealing to retain their beauty and durability.

Permits, Mockups & Sample Approvals

Local permitting processes in the Bahamas typically require 2-6 weeks depending on project scope and location. Resort and commercial projects often need additional approvals that extend timelines.

Sample panels and mockups need 4-6 weeks minimum for proper evaluation. This includes material delivery, installation, stakeholder review, and approval documentation. Rush approvals often lead to selection regrets and change orders.

Color and finish consistency verification becomes critical for natural stone. Plan mockup installation during the same season as final installation to account for lighting and weathering variations.

Contractors installing pavers during a sunny, dry season
This image visually represents the ideal weather conditions for paver installation.

Contractor Scheduling & Busy Season Notes

Tropical paving calendar demand peaks during dry season when optimal working conditions attract multiple projects simultaneously. Book qualified contractors 8-12 weeks in advance for peak season installation.

Many experienced paving contractors travel between Caribbean islands following seasonal demand patterns. Confirm contractor availability and backup options before finalizing installation timing.

Consider that resort and commercial projects often receive priority scheduling due to higher values and repeat business potential. Residential projects may need flexibility in scheduling to accommodate contractor availability.

Installation Quality Factors Affected by Season

Subgrade Moisture & Compaction

Saturated subgrades represent the primary quality threat to hurricane season paver scheduling and wet season installations. Proper compaction requires subgrade moisture content within acceptable ranges for density achievement.

Visibly saturated soils cannot achieve proper compaction densities regardless of equipment or effort. Attempting installation on wet subgrades leads to settlement, joint opening, and premature failure requiring expensive reconstruction.

Allow 7-14 days drying time after heavy rainfall before resuming base preparation work. Coral-based Bahamian soils drain relatively quickly but retain moisture longer than sandy mainland soils.

Bedding Sand and Joint Setting

High humidity during wet season extends setting times for polymeric joint sand and affects sand moisture content during installation. Excess moisture can cause premature activation of polymeric binders before proper joint filling.

Joint sand installation requires consecutive dry days for proper activation and initial curing. Rain within 24-48 hours of joint sand installation can cause washout and require complete rework.

Plan joint sand installation for periods with favorable weather forecasts showing 3-5 consecutive dry days. This timing becomes critical during transition months with unpredictable weather patterns.

Mortar and Cement Cure Times

Mortar-set applications common in pool coping and formal plaza work require extended curing protection during humid conditions. High humidity slows moisture evaporation and extends cure times significantly.

Portland cement-based setting beds need protection from rapid moisture loss in dry conditions and extended curing in humid periods. Plan installation techniques appropriate for seasonal conditions.

Consider modified installation methods during challenging seasons. Polymer-modified mortars and rapid-setting materials may justify higher costs for schedule reliability.

Order Stone Pavers Bahamas now and add a sophisticated edge to patios, walkways, and pool surrounds.

Logistics & Staging Strategies for Island Work

Shipping & Port Considerations

Island paver delivery planning must account for limited container vessel schedules serving the Bahamas. Major shipping lines typically provide weekly service, though schedules may reduce during off-peak seasons.

Container demurrage charges accrue for delayed pickup, typically $75-150 per day after free time expires. Plan receiving logistics carefully to avoid costly demurrage fees that can add thousands to project costs.

Port congestion during peak construction season can delay container release and increase handling costs. Schedule deliveries during off-peak periods when possible to ensure prompt processing.

On-Island Staging and Storage

Covered storage becomes essential for materials staged longer than 30 days, particularly during transition periods when weather conditions change rapidly. Exposed staging risks water damage, staining, and biological growth.

Elevated storage prevents ground moisture wicking and provides drainage during heavy rainfall. Standard wooden pallets deteriorate quickly in tropical humidity, while plastic pallets offer better durability for extended staging.

Consider rental storage facilities for valuable materials during extended staging periods. Professional storage often costs less than material replacement after weather damage.

Just-In-Time vs Staged Deliveries

Just-in-time delivery minimizes staging costs and weather exposure but requires precise scheduling coordination. This approach works best during peak dry season when weather disruptions are minimal.

Staged deliveries allow buffer time for weather delays and schedule flexibility but require secure storage and inventory management. Stage materials by installation phase to minimize handling and damage risks.

Hybrid approaches work well for larger projects: stage base materials and standard pavers while using just-in-time delivery for specialty items and final installation materials.

A hurricane warning sign in the Bahamas
This image highlights the most significant weather risk in the region that affects construction.

Hurricane-Season Safeguards & Scheduling Rules of Thumb

Practical Hurricane Windows and Cutoff Dates

Recommend final material deliveries and exposed staging be completed by May 15 (practical guideline) for high-risk coastal sites. This provides buffer time for installation completion before peak storm season.

Projects requiring extended staging should plan covered storage or delay deliveries until late November. The risk-reward calculation rarely favors hurricane season staging for non-emergency projects.

Emergency repair projects during hurricane season require special precautions including elevated storage, storm tracking, and rapid deployment capabilities.

Material Protection Strategies

Temporary protection for staged materials includes waterproof covers, elevated storage platforms, and secure tie-downs rated for hurricane-force winds. Standard construction tarps prove inadequate for storm protection.

Shrink-wrapping individual pallets provides excellent moisture protection but requires professional application and storm-resistant securing systems. Budget $50-100 per pallet for professional protection.

Consider relocating valuable materials to interior storage facilities when storms threaten. The cost of temporary relocation often proves less expensive than material replacement after storm damage.

Contract Clauses & Risk Management

Include specific hurricane season force majeure clauses with clear cutoff dates for material delivery and installation activities. Standard force majeure language may not address seasonal storm risks adequately.

Specify insurance requirements for materials in transit and storage, including named storm coverage. Standard contractor insurance may exclude hurricane damage to staged materials.

Establish clear protocols for storm preparation including material securing responsibilities, communication procedures, and post-storm damage assessment. Document these procedures before storm season begins.

Buy Outdoor stone tiles Bahamas today to enhance curb appeal with a product that ages gracefully.

Post-Installation Timing — When to Seal, Open to Traffic & Warranty Start

Traffic Loading and Cure Times

Pedestrian traffic can typically resume 24-48 hours after installation completion, depending on setting method and weather conditions. Longer cure times may be required during high-humidity periods.

Vehicle traffic should wait minimum 7 days for standard installations, with heavy vehicle access delayed 14+ days. These timelines extend during humid conditions when curing proceeds more slowly.

Document actual installation completion dates and weather conditions to establish appropriate traffic opening schedules. Rush traffic loading often leads to joint disruption and premature wear.

Sealing Timing and Moisture Considerations

Initial sealing should occur 30-90 days after installation to allow initial efflorescence and moisture migration. Sealing too early can trap moisture and cause long-term staining problems.

Best timing for sealing in the Bahamas occurs during dry season months when low humidity allows proper sealer penetration and curing. Avoid sealing during wet season when trapped moisture risks increase.

Plan sealing during periods with 3-5 day favorable weather forecasts. Rain within 24-48 hours of sealing can cause application failures requiring costly rework.

Warranty Documentation and Acceptance

Establish clear acceptance criteria tied to seasonal completion timing. Warranty periods should begin after proper curing and initial sealing completion, not installation date.

Document installation conditions, weather exposure, and curing periods to support warranty claims. Seasonal installation timing affects performance expectations and warranty coverage.

Conduct formal acceptance inspections 30-60 days after completion to identify any settling, joint issues, or moisture-related problems before warranty periods begin.

Sample Project Schedules — 3 Scenarios

Scenario A: Small Residential Patio (8-12 Week Timeline)

Ideal months: January-March completion

  • Week 1-2: Material selection, mockup panel approval
  • Week 3-4: Final material order, permit applications
  • Week 5-8: Material delivery, contractor scheduling
  • Week 9-10: Site preparation, base installation
  • Week 11: Paver installation and joint filling
  • Week 12: Initial curing, project completion

Timeline allows for weather delays and ensures completion before wet season begins.

Scenario B: Resort Pool Deck Renovation (Phased Staging)

Critical hurricane cutoff approach:

  • December-January: Phase 1 material delivery and staging
  • February-March: Phase 1 installation (pool areas)
  • April-May: Phase 2 delivery and installation (deck areas)
  • May 15 completion target to avoid hurricane season exposure
  • Post-season: Final sealing and landscaping restoration

Phased approach maintains guest access while ensuring storm-season completion.

Scenario C: Commercial Driveway/Service Lane

Heavy load preparation timeline:

  • November-December: Enhanced base specification, material procurement
  • January-February: Excavation, subgrade preparation, base installation
  • March-April: Paver installation with heavy-duty edge restraints
  • May: Extended curing period before full vehicle loading
  • 14-day minimum cure before heavy traffic loading
A pristine, completed paver patio at a Bahamian home
This image shows the successful outcome of a well-timed and executed project.

Seasonal Checklist — 10 Items to Complete Before Installation

Bahamas Paver Installation Seasonal Checklist (Download-Ready):

  • Verify lead times and confirm delivery windows avoid hurricane season staging
  • Order mockup panel minimum 60 days before installation to allow proper evaluation
  • Confirm vessel arrival window with shipping lines and plan backup delivery dates
  • Arrange covered staging for any materials delivered more than 30 days before installation
  • Confirm contractor availability during optimal installation months with backup options
  • Schedule installation completion by May 15 for projects requiring hurricane season protection
  • Confirm material test certificates (ASTM standards) and verify coastal performance data
  • Set 15-20% waste allowance for island projects compared to 10% mainland standard
  • Define acceptance criteria tied to seasonal timing and weather exposure periods
  • Secure 10% holdback in contract pending post-season performance verification and warranty start

FAQs — Short Practical Answers

When is the hurricane cutoff for deliveries? Recommend final deliveries by May 15 for exposed staging. Materials can arrive later if covered storage is arranged, but installation should complete before June 1 hurricane season start.

How much extra should I order for island loss? Plan 15-20% overage for Bahamian projects compared to 10% mainland standard. Account for shipping damage, installation waste, and future storm repair needs.

Can installation proceed after heavy rains? No. Allow 7-14 days drying time after heavy rainfall before resuming base preparation. Saturated subgrades cannot achieve proper compaction densities regardless of equipment.

When should I schedule sealing in the Bahamas? Plan initial sealing 30-90 days after installation during dry season months (December-April). Avoid wet season sealing when trapped moisture risks increase significantly.

How long should I allow between install and first vehicle traffic? Minimum 7 days for standard vehicles, 14+ days for heavy vehicles. These timelines extend during humid conditions when curing proceeds more slowly.

What to do if a storm is forecast during installation? Stop work immediately and secure staged materials. Don’t attempt to rush installation completion. Storm damage to fresh installation often requires complete reconstruction.

Citadel Stone Case Studies: Natural-Stone Projects Across the Bahamas

Nassau — high-end hospitality, heritage conservation and coastal exposure

Why it matters: Nassau’s mix of luxury resorts, government buildings and historic districts demands stone that balances aesthetics, durability and conservation-friendly techniques. Materials must resist salt, sun and heavy foot traffic while matching older masonry where required.

Materials & applications: coral and fossil limestone façades, honed travertine for lobbies and pool decks, precision-cut limestone veneers for restored colonial porticos.

Procurement & technical tips: require salt-spray and UV-fade test certificates for exterior stone; insist on mock-ups next to original masonry to confirm colour and mortar match; specify marine-grade stainless fixings and a breathable back-profile for cladding to avoid trapped moisture.

How Citadel Stone helped: supplied factory-prefinished travertine wall panels that slotted into crane windows and reduced onsite wet trades; produced hand-tooled limestone replacement blocks matched to neighbouring colonial fabric; ran a conservation-techniques workshop with heritage stakeholders so repairs were reversible and approved by local conservators.


Freeport — industrial port works and precision prefabrication

Why it matters: Freeport combines heavy port activity with resort development; projects need stone able to tolerate vehicle loading, frequent cleaning, and fast, predictable installation windows.

Materials & applications: abrasion-rated granite for cargo aprons, reinforced limestone coping for promenades, CNC-cut coral stone paving for resort plazas.

Procurement & technical tips: require compressive-strength and abrasion test data for port uses; specify factory-drilled holes and pre-assembled rails to reduce field drilling; group deliveries into timed blocks that match port off-peak slots to avoid demurrage.

How Citadel Stone helped: engineered pre-anchored limestone façade modules that cut field installation time by weeks; coordinated consolidated container shipments to lower landed cost; implemented a batch-inspection protocol on arrival to catch variation before installation.


Lucaya (Freeport area) — small-scale luxury fit-outs and rapid turnarounds

Why it matters: Lucaya’s boutique hotels and villa developments need small, consistent runs of premium stone with minimal handling and quick on-island conditioning to preserve colour.

Materials & applications: thin honed limestone tiles for terraces, pre-sealed travertine coping, hand-dressed coral brick for interior feature walls.

Procurement & technical tips: demand factory pre-sealing for exposed terraces to reduce first-season staining; set strict ΔE colour tolerances for repeat batches; use UV-stable cover storage on arrival to condition stone before installation.

How Citadel Stone helped: delivered colour-calibrated veneer packs and provided labelled crate sequencing so installers placed matched pieces together, eliminating visible tone shifts across phased installs; offered a short on-site conditioning period and accepted slightly longer lead times for superior finish consistency.


West End — heritage residences, marine detailing and logistics sensitivity

Why it matters: West End requires solutions that respect small-town heritage while delivering marine-grade durability for private docks and coastal homes, with logistics shaped by limited port facilities.

Materials & applications: antique-finish reef coral blocks, compact limestone slabs for private terraces, textured seawall coping.

Procurement & technical tips: pre-clear small port paperwork to avoid berth delays; request tighter crack- and fissure tolerances for reef coral used in load-bearing applications; choose packaging that fits small barge or truck loading constraints.

How Citadel Stone helped: designed custom crates and barge-friendly pallet sets that reduced breakage and off-loading time; supplied antique-finish blocks matched to existing villas; trained local masons in dry-stack techniques that preserved traditional aesthetics and speeded installation.


Cooper’s Town — boutique restorations and low-impact island logistics

Why it matters: Cooper’s Town projects often centre on boutique guesthouses and restorations where hand-crafted finishes and simple maintenance are priorities; freight and handling must suit small wharves and limited storage.

Materials & applications: hand-split coral brick for porches, tumbled limestone pavers for intimate courtyards, preformed coping units for small pools.

Procurement & technical tips: plan many small shipments timed to calmer sea windows; demand smaller crates sized for island forklifts and covered staging to avoid sun-bleaching; supply clear installation templates for local trades to minimise re-cuts.

How Citadel Stone helped: created a “micro-crate” packing system that cut transit damage and simplified handling; delivered pre-measured paver kits with an illustrated installation sheet tailored for local carpenters and masons; hired and trained local labour for finishing work to leave skills and reduce return-visit dependencies.


Marsh Harbour — resilient rebuilds, community infrastructure and rapid response

Why it matters: Marsh Harbour’s rebuilding needs and harbour upgrades require marine-grade stone, fast mobilization and solutions that reduce long-term maintenance for community budgets.

Materials & applications: dense coral-limestone seawall units, textured sandstone plaza paving, permeable stone pavers for community plazas to improve stormwater handling.

Procurement & technical tips: for seawalls demand salt-crystal testing and engineered interlock designs; order sealants and grout with delivery timed to installation to avoid on-island stockouts; maintain spare units locally for rapid patch repairs.

How Citadel Stone helped: designed interlocking marine limestone blocks that lengthened service life and simplified replacement; supplied an emergency spare-kit and logistics plan that enabled the council to patch a damaged quay quickly after a storm; ran contractor training on joint sealing and reef-friendly cleaning to protect adjacent marine habitats.

Conclusion & Next Steps

Successful paver installation Bahamas timing requires careful coordination of seasonal weather patterns, shipping schedules, and installation quality requirements. The optimal window runs December through April, with January through March offering peak conditions for material delivery, base preparation, and installation completion.

Projects scheduled outside optimal windows face increased costs, quality risks, and potential weather delays that can extend timelines significantly. The investment in proper seasonal planning pays dividends through improved installation quality, reduced weather risks, and lower total project costs. 

Start your planning process 4-6 months before desired installation completion to allow adequate time for material procurement, contractor scheduling, and weather contingencies. Early planning ensures access to optimal installation windows and qualified contractor availability.

Ready to plan your Bahamas paver project?

Understanding these seasonal timing fundamentals positions your project for installation success while minimizing the unique risks that island construction presents. Proper timing transforms challenging Bahamian conditions into advantages through strategic seasonal planning. Share your ideas for projects, and let your stone supplier Bahamas bring them to life.

Get access to the BEST place for selecting and styling stone tiles to elevate your space, not your budget.

Limestone Tile Pricing Overview

Get $20,000 Worth of Deals on Beautiful Stone Tiles—For Free!

ShellStone - Ocean Reef Limestone

Shells & Fossil-rich
2
50
$ Square Feet
  • Wholesale Price
Popular
Most Popular

White Limestone

Shells & Fossil-rich
2
2
$ Square Feet
  • Wholesale Price

Black Basalt

The toughest stone in the market
2
1
$ Square Feet
  • Wholesale Price
Popular

Need a Sample? Request Your Free Today

See It to Believe It

Book a Free Consultation

Get Expert Advice: Explore Your Tile Options

Why Go Citadel Stone?

Free Comparison: Citadel Stone vs. Other Suppliers—Find the Best Value!

FeaturesCitadel StoneOther Stone Suppliers
Exclusive ProductsOffers exclusive Ocean Reef pavers, Shellstone pavers, basalt, and white limestone sourced from SyriaTypically offers more generic or widely available stone options
Quality and AuthenticityProvides high-grade, authentic natural stones with unique featuresQuality varies; may include synthetic or mixed-origin stone materials
Product VarietyWide range of premium products: Shellstone, Basalt, White Limestone, and moreProduct selection is usually more limited or generic
Global DistributionDistributes stones internationally, with a focus on providing consistent qualityOften limited to local or regional distribution
Sustainability CommitmentCommitted to eco-friendly sourcing and sustainable production processesSustainability efforts vary and may not prioritize eco-friendly sourcing
Customization OptionsOffers tailored stone solutions based on client needs and project specificationsCustomization may be limited, with fewer personalized options
Experience and ExpertiseHighly experienced in natural stone sourcing and distribution globallyExpertise varies significantly; some suppliers may lack specialized knowledge
Direct Sourcing – No MiddlemenWorks directly with quarries, cutting unnecessary costs and ensuring transparencyOften involves multiple intermediaries, leading to higher costs
Handpicked SelectionHandpicks blocks and tiles for quality and consistency, ensuring only the best materials are chosenSelection standards vary, often relying on non-customized stock
Durability of ProductsStones are carefully selected for maximum durability and longevityDurability can be inconsistent depending on supplier quality control
Vigorous Packing ProcessesUtilizes durable packing methods for secure, damage-free transportPacking may be less rigorous, increasing the risk of damage during shipping
Citadel Stone OriginsKnown as the original source for unique limestone tiles from the Middle East, recognized for authenticityOrigin not always guaranteed, and unique limestone options are less common
Customer SupportDedicated to providing expert advice, assistance, and after-sales supportSupport quality varies, often limited to basic customer service
Competitive PricingOffers high-quality stones at competitive prices with a focus on valuePrice may be higher for similar quality or lower for lower-grade stones
Escrow ServiceOffers escrow services for secure transactions and peace of mindTypically does not provide escrow services, increasing payment risk
Fast Manufacturing and DeliveryDelivers orders up to 3x faster than typical industry timelines, ensuring swift serviceDelivery times often slower and less predictable, delaying project timelines

Extra Benefits

Choosing Citadel Stone offers unique advantages beyond premium stone quality:

Exclusive Access to Rare Stones

Citadel Stone specializes in unique, regionally exclusive stones, sourced directly from the Middle East.

Transparent Pricing with No Hidden Costs

With no middlemen, Citadel Stone provides direct, transparent pricing that reduces unnecessary costs.

Flexible Customization for Bespoke Projects

Tailor your order to precise specifications, from sizes to finishes, ensuring your project aligns perfectly with your vision.

Streamlined Delivery and Reliable Stock Availability

Benefit from fast production and delivery timelines, designed to minimize delays and ensure reliable availability.

Top-performing World Leading Companies Choose Our Premium Natural Stones

Scale your project without breaking the bank

With unlimited tiles, features, and the fastest delivery options, What’s not to love? Say goodbye to unnecessary hassles!

Leading Stone Suppliers are Loving Citadel Stone!

Do not let this golden opportunity slip by to
source your stone tiles

30-Day Satisfaction Guarantee

If you’re not 100% satisfied with Citadel Stone products, we’ll not ship your order. No hassle, no risk involved.

Alternative Products Available

Product NameDescriptionPrice per Square Foot
Travertine TilesBeautiful natural stone with unique textures$8.00 - $12.00
Marble TilesLuxurious and elegant, available in various colors.$10.00 - $15.00
Granite TilesExtremely durable and perfect for high-traffic areas.$7.00 - $12.00
Slate TilesRich colors and textures; ideal for wet areas.$6.00 - $10.00
Porcelain TilesVersatile and low-maintenance, mimicking natural stone.$4.00 - $8.00
Ceramic TilesAffordable with a wide variety of designs.$3.00 - $6.00
Quartzite TilesStrong and beautiful, resistant to stains.$9.00 - $14.00
Concrete PaversCustomizable for patios; durable and cost-effective.$5.00 - $9.00
Glass TilesStylish, reflective, and brightening.$15.00 - $25.00
Composite TilesEco-friendly options made from recycled materials.$5.00 - $10.00

Free Calculator for Limestone Tiles: Precisely Plan Your Project Needs

Square Foot Calculator

Frequently Asked Questions

If your question is not listed, please email us at [email protected]

When is the best time to install pavers in the Bahamas?

Short answer: Schedule major paver work during the dry season (roughly December–April).
Why: the dry season offers lower humidity, fewer storms, and longer consecutive dry days—conditions that improve base compaction, bedding uniformity, joint-setting, and curing of sealers and adhesives. Concrete, polymeric sands, mortar and sealers all perform far better when they can cure without interruption from heavy rain or salt-laden spray. For most projects, plan your installation window for December through March for the most reliable weather and the quickest, cleanest installs.

Key dates: Atlantic hurricane season runs June 1 – November 30.
Practical planning tips:

  • Avoid major installs during June–November if at all possible. Even outside actual storms, this period has higher rainfall, unpredictable wet spells, stronger winds, and increased salt spray that can disrupt curing and wash out joints.

  • If unavoidable, build contingencies: require your supplier/contractor to provide a dry-day schedule, ask for a written rainy-day protocol (how materials & laydown areas will be covered, crated, and elevated), and include an agreed buffer of 2–4 weeks in the contract for storm delays.

  • Reserve spare stock (5–10% extra pavers) held in a protected, elevated laydown area—storms often damage pallets in transit or at site.

  • Timing for post-storm repairs: schedule major deliveries and final jointing/sealing no sooner than 7–14 days after a significant salt-spray event to allow thorough rinsing and drying.

  • Contract clause: add a force-majeure plan with alternative sourcing from the supplier’s regional depots and defined remedies (expedited re-ship, credit) if a hurricane impacts the quarry or transport route.

Season-sensitive processes & adjustments:

  • Base compaction & subgrade prep: Wet soils compact poorly. Do this in dry months or after at least 72 hours of dry weather. Use geotextile and well-draining open-graded aggregate to minimize future water retention.

  • Bedding layer & jointing (polymeric sand): Polymeric sand requires dry joints and dry weather for 24–72 hours after application to cure properly. Schedule polymeric sand installs in a confirmed dry window; for humid conditions, consider using permeable joint infill or structural grout alternatives that are less moisture-sensitive.

  • Mortars & adhesives (for set pavers or stone): They need predictable curing—avoid installing these during rainy patterns. If you must install in humid months, use fast-set or modified formulations specified for tropical climates and follow manufacturer temperature/humidity limits.

  • Sealing: Apply breathable, penetrating sealers only when the material surface is bone-dry and at least 48–72 hours of dry forecasted weather remains. Sealers applied before adequate drying risk trapping moisture and causing haze or adhesion failure.

  • Permeable systems: These tolerate wet weather better during installation, but subbase compaction and geotextile placement still need dry or controlled conditions to avoid contamination with fines. If installing permeable pavers in the wet season, increase inspection frequency for joint washout after the first big rains.

Quick operational checklist: confirm a continuous dry forecast for the critical 72-hour windows (compaction → bedding → jointing → sealing), stage all materials off the ground under breathable covers, and require your contractor to do a pre-pour/laydown weather check before each critical operation.

For historic districts or restricted zones, we coordinate with local authorities to secure delivery permits, street‑closing arrangements, and noise‑variance approvals—ensuring zero compliance delays.

Our micro‑CNC tessellation capabilities produce mosaics with 5 mm precision, while proprietary color‑matching software ensures seamless blends of multiple stone types.

While primarily a supplier, Citadel Stone works directly with natural stone manufacturers to ensure the highest quality products are available to clients across the Bahamas and the Caribbean. This direct relationship allows us to influence production standards and offer bespoke solutions, effectively bringing manufacturer-level quality and customization to our customers.